Project Status
Week of 02-27-19
Project is: ON TRACK
The project is still on track, although we will need to order the PCB soon to be able to stay on track.
Issues / Extra progress from last week:
​
-
Acquired material for rear sprocket
-
Started machining spacers
Accomplished this week:
-
Started detail design of the motor mount assembly

-
Started fabrication of spacers

-
Battery frame fit check
-
The edges of the battery ID pockets needed to be​ deburred/chamfered. The diameter size 18.5mm was a perfect fit
-
The sides of each frame needed to be sanded flat, dove tails could use one more small adjustment for an easier fit.
-


-
Battery spot welding test
-
Sunkko 788H spot welder
-
Settings used: ​Current 80, Pulse 2, Power 6
-
The foot pedal made using the spot welder easier and also added more current to the weld. Two pumps on the pedal made for a secure spot weld.
-
I would recommend wearing safety glasses, if both prongs are not touching the nickel strip with sufficient pressure there will be a spark.
-
I cut the nickel strip with sheet metal cutters and it left a serrated edge. For future cutting I will use some industrial scissors
-
-




-
Ebay battery pack disassembly
-
This was a mountain bike headlamp that I purchased three years ago. I got two good seasons out of it and this year it only stays charged for 10 minutes.​
-
During the disassembly of the battery pack I found that there were only two batteries connected in the system. The other two batteries, tubes filled with sand, were hot glued to the side to give the appearance of a 2S2P battery pack.
-

-
Wiring Schematic

-
Completed some circuitry
-
Completed some motor driver code
Goals for next week:
-
Waterjet rear sprocket
-
Work on code for throttle pot
-
Finish motor driver circuit
-
Order PCB
References:
-
ebike school https://www.youtube.com/watch?v=u-4mKh1WaLo&t=463s