top of page

Project Status

Week of 02-13-19
Project is: ON TRACK

Even though not a lot was accomplished this week, the project is still on track and moving forward

Issues / Extra progress from last week:
​
  • Need to source a company for PCB

  • Found an interference with the Chain to front sprocket guard.

chain_limits_extended.JPG

In the extended position there is clearance​

chain_limits.JPG

At the limits of the rear suspension travel the chain interferes with the sprocket guard.

  • After printing the modular battery brackets we identified too much tolerance build up and need to tweak the dove tails.

20190212_213509.jpg
Accomplished this week:

Electrical

  • Continued progress on Argon programming

  • Motor driver circuit nearing completion 

Production

  • Met with Barry to identify possible material use

  • Hopeful to acquire materials and turn spacers on 2/15

Goals for next week:
  • Finish motor driver circuit

  • Order PCB

  • Continue Argon programming

  • Finalize design for modular battery brackets and start printing.

  • Test weld a small battery pack

  • Source 18650 batteries from a reputable seller at a descent price

bottom of page